Most viewed |

440 viewsJ. Floyd State Park K-2187 on 04-27-2022. We set up down by the dam of the lower lake. John KB4QXI worked 20 meters with a ham stick on the roof of his car and made 60 contacts, 4 P2P, 6 Canadians and Spain. Tony WA4TW went first on 40 meters using the End Fed Half Wave wire rigged as a sloper fed from the bottom. He made 60 contacts before lunch. After lunch Allen KN4FKS took over the microphone and Tony logged. Allen made 42 contacts with 2 P2P before the battery was almost gone at 7% remaining.
|
|

440 views
|
|

440 views
|
|

440 views
|
|

440 views
|
|

440 views
|
|

440 views
|
|

440 views
|
|

440 viewsMade it ! Reached a POTA milestone for Cloudland Canyon State Park K-2169 Thursday. The 'KILO' award is for making one thousand contacts from a specific park. (see attached photo)
The space weather cooperated for an exceptional day and the terrestrial weather cooperated as well by not being to hot in our shady location at the Ascalon Trailhead.
In addition to our radio gear we had two 12 volt fans running off battery power. Allen KN4FKS started off on 20 meters with Danny AG4DW logging.. Fred KQ4JXX provided adult supervision for the crew. Allen KN4FKS made a total of 107 contacts with 12 P2P and 13 Canadian contacts. After lunch Danny AG4DW got on 20 and made a quick 14 contacts before it just was getting too warm to be fun. Even on top of the mountain and in the shade it was 90 degrees F.
The rig we used was my trusty old ICOM 706 Mk IIG at 100 watts with 50 ft of RG-8-X coax feeding and end fed half wave rigged as a sloper with the balun on the ground stake. To make 107 contacts the battery meter showed only 6.5 amp hours of the 20 Ahr battery used. Fun day was had by all even after getting wasp stung.
|
|

440 views
|
|

440 views
|
|

440 views
|
|
| 4014 files on 335 page(s) |
 |
 |
 |
 |
 |
166 |  |
 |
 |
 |
|