Most viewed |

458 views
|
|

458 views
|
|

458 views
|
|

458 viewsWe activated Cloudland Canyon State Park US-2169 on Thursday May 29. We set up in the picnic shed on top of the hill at the highest point on the park next to the disc golf course. It wasn't raining when we set up but it certainly was when we were taking down.
Allen KN4FKS set up his new 25 foot tall Chameleon vertical and made a fairly quick 35 contacts on 20 meters. Then moved to 17 meters and slowed down a bit to make 19 contacts. Then moved to 40 meters to make 3 contacts. for a total of 57 contacts with 7 park to park contacts with 2 DX contacts, Mexico and Canada. The bands were wonky with signals coming and going or just non existent. The sun burped once more.
Danny AG4DW set up his elevated radial POTA performer vertical and made a total of 73 contacts, 47 on SSB, with 10 P2P contacts then 25 contacts on FT8 all on 40 meters, he then retuned and made 1 contact on 30 meters. Dan K2DTS used his mag mount HamStick and made 27 contacts on 20 meters, 16 SSB, 6 FT8, and 4 FT4.
Notable contacts on the day was first the US aircraft carrier USS Lexington W5LEX was hunting parks and gave me a call. Then later a booming signal 'park to park' came and it was David WK4DS calling from the Ascalon Trailhead in the same Cloudland Canyon Park property. He was probably two miles away. Then the next contact was in Washington state. \
The bands were odd short and then long. Did I mention it rained? I haven't packed away dry gear in over a month. I'm ready for some sunshine. Regardless a fun time was had by all.
|
|

458 viewsIn case you have been under a rock for some time this weekend was the ARRL Field Day event. Several of us with the TSARC set up at the Cedar Grove Community Center in SW Walker County. The community center is a great location for field day with one exception. It has air conditioning a big plus, a full kitchen, lots of space to set up, a basket ball court sized big central room And did I mention air conditioning!. The one problem with the location in the valley is that it is surrounded on three sides by nearby Lookout mountain and Pigeon Mountain. So getting a signal out of this hole is difficult but doable.
We got off and running Saturday afternoon and as usual a big thunderstorm rolled in over the mountain. Quickly we disconnected antennas and watched the rain blow sideways first one direction then the other. Ed KM6UTC has his vertical antenna support tripod blow down but luckily it was not damaged. Then late Sunday morning here came another big storm so we called it quits and hurriedly got all the antennas down and everything packed away just before the storm hit once more. The timing was excellent as we had just run out of cookies to munch on. A crisis was at hand.
Field day is POTA done large and all of us have gotten lots of practice operating portable. But field day is not POTA as there were no peanut butter and jelly sandwiches.
|
|

457 views
|
|

457 views
|
|

457 viewsChickamauga Battlefield Park - 09-19-2020
|
|

457 views
|
|

457 views
|
|

457 viewsPOTA - Crockford-Pigeon Mtn. at Atwood Point - 09-23-2021
|
|

457 views
|
|
| 4018 files on 335 page(s) |
 |
 |
 |
 |
 |
219 |  |
 |
 |
 |
|