Most viewed - Parks on the Air |

617 viewsWhat an adventure. After a rendezvous in Scottsboro AL the POTA crew headed out in four vehicles to the Fern Cave National Wildlife Refuge K-0140. After a few highway miles we turned onto a county paved road and went to its end where we came to the first of four locked gates. Thanks to the Southeast Cave Conservancy Inc. for giving us permission to access their property which adjoins the NWR property. The road is 3.8 miles to our activation site and gets worse the further along we get. There are mudholes, rocky ledges, and gooey slick mud. Luckily no one got stuck or broke anything. Arriving at the end of the road we get turned around and begin unloading our gear. We walk a few steps and cross onto the NWR property where we set up four stations.
We made a total of 129 contacts. When we first got on the air we all were making contacts quickly then it was like you turned out the lights. Till we took a break for lunch getting contacts got harder and harder. The solar storm had hit hard. So then at lunch we start hearing thunder in the distance, A quick look at the weather radar reveals we are in the path of a line of thunderstorms. Radio gear and the 4x4 road we must take out do not react well to heavy rain. After we enjoyed Karen's blueberry "POTA PIE" we pack up everything and head out back to pavement, opening and closing all the gates as we go. Back on the pavement the vehicles are muddy to the windows and mud falls off the undercarriages. Luckily we outran the storms all the way home. The radar images later showed this big red blob passed directly over where we were activating. At a similar cave road location about 20 miles north a group found their access road flooded and several of their vehicles will have to be left on high ground for days till it quits raining. The vehicles that did get out had water over their headlights. The road we used only floods and traps vehicles after multiple heavy rains flood the valley. It has happened in the past but not for us this time.
Fern Cave NWR K-0140 was first activated by our crew in Nov. 2020. There have been 4 other small activations since then then our recent activation. Our group in two activations is responsible for 80% of the 487 total contacts made from this site. The other activators have accessed via canoe down the Paint Rock River. The 190 acre refuge is totally landlocked with no public access point. It is simply there to protect a cave where endangered bats live.
A mini DXpedition it was, with problems to be overcome, logistics to be planned and permissions obtained. This crew of experienced POTA operators had a successful POTA activation.
|
|

616 viewsPOTA - Russell Cave - 7-19-2021
|
|

616 viewsPOTA - Johns Mountain Overlook - 12-02-2021
|
|

616 viewsWe activated Chickamauga Battlefield US-0716 yesterday at the Wilder Recreation Field site. This is on the West side of the park and was the front line on the third day of the battle. A dozen deer wandered across the field in front of us and the sun actually made it right pleasant.
As we gathered we agreed to a band plan as to who would be operating on which band. Then it was set up time. Allen KN4FKS and Danny AG4DW decided to utilize the nearby picnic tables and set their vertical antennas on opposite sides. Ed KM6UTC set up in the back seat of his vehicle. Dan K2DTS was on the far end of the parking lot and when John KB4QXI got there he also set up in the front of the parking lot.
Allen chased Park to Park contacts on 20 meters SSB and needed 20 P2P's to make a double Kilo ( 2000 ) P2P POTA award. with 21 made it was a successful day. Danny cranked up on 15 Meters, caught a band opening and worked DX into Belgium, Canada, England, Germany, France, Italy, Sweden, Hawaii, and Mexico. He had a total of 104 contacts with 46 SSB and 58 FT8 all on 15 meters. Ed worked 10 meters and had 46 FT8 contacts with 22 of those being DX. Dan worked the WARC bands of 12 & 17 meters and I don't know his totals. John worked 40 meters and had 26 contacts with 4 P2P.
A fun day was had by all, there were lots of park visitors coming by and one cyclist chatted and his father, SK now was a Ham back in the 50's he could even remember his call sign. In the attached photos we utilized the latest model of line gun to get antennas set. Hi Hi.
|
|

615 viewsPOTA - Arrowhead Wildlife Mgt Area - 2-24-2021
|
|

615 viewsWe activated Chickamauga National Battlefield today, K-0716 Georgia. Made 70 contacts on 20 meters with 9 P2P and 5 DX contacts. One of the contacts actually had ancestor who fought in the battle fairly near where we were operating from. I stopped at lunch and then Tony WA4TW took over operating and cranked up on 40 meters He made 18 contacts with 5 P2P. The band came back then after a few minutes faded away again then came back. We checked and North America was center of large solar flare hit.
|
|

615 viewsPOTA - 2022-09-01 - Today we went to Cohutta Wildlife Management Area K-7446 over East of Chatsworth GA. We set up two stations each using an end fed half wave wire rigged as a sloper fed from the bottom. Battery power ran the 100 watt transceivers. Peter KX4BE worked CW on 20 meters and had 42 contacts with 1 P2P and 1 DX contact. Allen KN4FKS worked SSB on 40 meters and had 34 contacts with 4 P2P. Tony got on 20 meters SSB and made 15 contacts with 6 P2P and 1 DX to Alaska. Another great day doing POTA !
|
|

615 viewsWe gathered this past Thursday at Red Clay State Park US-2970 for an activation day. It was a pleasant day weather wise with lots of shade and a nice breeze.
Danny AG4DW set up his POTA Performer vertical antenna for Jody W4LWC to use. A Rambler Radio Club graduate Emma Gillenwater who lives near the park now joined us. They made 72 contacts on 20 meters SSB with 4 DX to Canada and 1 to the Netherlands. It was great to see Emma once more.
Allen KN4FKS set up his 17 meter folded dipole and made 17 contacts on 17 meters SSB with 1 P2P and DX to Canada, France, England, and 2 Italians. Dave KQ4GLQ set up in the picnic shed and worked 40 meters SSB. I don't have his totals, but he had a good day. Dan K2DTS stopped by and without band pass filters could not get but 1 contact on 15 meters. However he moved away from us and ended up with 15 contacts on 20 meters. He was amazed that he actually heard stations in Bulgaria and Vietnam. They were strong but he was unable to break the pile up. Cool nonetheless.
John KB4QXI arriving fashionably late managed 11 contacts with 3 P2P after moving to another parking lot on the park to escape all the RF.
Red Clay State Park is a small historic park. It was the capital of the Cherokee nation for many years. So for POTA it is also a Trail of Tears US-3791 location.
Fun day on the bands, we also were able to introduce ham radio to several park visitors.
|
|

614 viewsPOTA, Estelle Equestrian Farm - 8-14-2020 - Tony W4TDH with guests
|
|

614 viewsPOTA - with the Rambler Radio Club - 5-15-2021
|
|

614 viewsPOTA - Crockford-Pigeon Mtn. at Atwood Point - 09-23-2021
|
|

614 viewsThe Rambler Radio Club W4LMS activated Cloudland Canyon State Park US-2169 today from the park interpretive center.
We set up two stations, one on 40 meters and one on 20 meters. Band conditions were tough with a solar storm arriving this morning. In spite of everything the 40 meter station made 36 contacts with 20 P2P and no DX with kids as operators and Danny AG4DW as the Elmer. The 20 meter station made ??? contacts with ??? P2P and ??? DX.
With Jody W4LWC as Elmer. Allen KN4FKS acted as the visitor welcoming person answering questions and handing out HAM radio information. The park was very busy today and the parking lot stayed full all day with a steady stream of folks coming into the interpretive center. Several licensed hams dropped in and several prospective Hams were helped along the way.
Matt AF4MH came by as did John KB4QXI. John visited a bit then went up the hill to our usual POTA site and made 21 Contacts on 20 meters with 15 P2P and 2 Canadian parks contacted.
The bear wanted to work some DX but we were trying to make P2P contacts so he just stood quietly in the corner.
|
|
| 811 files on 68 page(s) |
 |
 |
 |
 |
 |
30 |  |
 |
 |
 |
|